Elevating multi-story parking garage - List of Manufacturers, Suppliers, Companies and Products

Elevating multi-story parking garage Product List

1~4 item / All 4 items

Displayed results

To the management association: Benefits of renewing the multi-story parking lot.

The size of the parking vehicle has increased! We will introduce the benefits of renewing the multi-story parking lot.

We offer proposals for "new replacement renewals" and "parts replacement renewals." In the case of new replacement renewals, the size of the vehicles accommodated increases without changing the depth of the pit, allowing for the storage of large vehicles and high-roof vehicles underground. For more details, please refer to the related links below. 【Features of New Replacement Renewal】 ■ Increased vehicle size without changing the depth of the pit ■ Rust prevention measures with hot-dip galvanized coating ■ By replacing machinery, core components can be updated to modern standards - Installation of safety gates for pit lift systems - Control panels - Charging facilities *For more details, please refer to the related links or feel free to contact us.

  • Car and bicycle parking facilities
  • Parking lot facility construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the management association: Multi-story parking lot 'AS-2P・2PS'

Semi-roof cars and one-box cars can be parked underground! An underground and above-ground two-tiered lift parking lot.

The "AS-2P・2PS" is a multi-story parking system that can accommodate a height of 1750mm underground and 2100mm above ground when outdoors. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns standing inside the pit are firmly assembled with structural brackets and walkways. The pallets are made into a single unit by welding, without the use of rivets or bolts, and are then finished with hot-dip galvanizing. 【Features】 ■ Major components are finished with hot-dip galvanizing ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Front safety gates and emergency stop devices can be installed ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the management association: Multi-story parking lot 'AS-3P'

One semi-roof car or one box car can be parked underground! It is a two-level underground and one-level above-ground elevating multi-story parking lot.

The AS-3P is a multi-story parking garage that can accommodate vehicles with a height of 1750mm on the basement level 2, 1550mm on the basement level 1, and 2100mm on the ground level 1. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns standing inside the pit are robustly assembled with structural brackets and walkways. The pallets are made into a single unit through welding without using rivets or bolts, and then finished with hot-dip galvanization. 【Features】 ■ Major components are finished with hot-dip galvanization ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Front safety gates and emergency stop devices can be installed ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the members of the management association: Multi-story parking lot 'AS-3QS'

A multi-story parking lot where semi-roof cars and one-box cars can be parked underground!

The "AS-3P" is an above-ground parking system with one underground level and two above-ground levels, designed for outdoor use, allowing vehicles with a height of 1700mm underground and 2100mm on the first and second floors to park. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns and beams are assembled very robustly using H-beams. The pallets are made as a single unit through welding without the use of rivets or bolts, and then finished with hot-dip galvanizing. 【Features】 ■ Major components are finished with hot-dip galvanizing ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Standard equipment includes a front safety gate, intrusion prevention sensors, vehicle overhang prevention sensors, and emergency stop devices ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration